| Nit No. | Name of Work (Click to view/download tenders) | Notification Date | Download Date | Submission Date | Opening Date | EMD(Rs.) | Corrigendum(if any) |
|
IRCON/ELECT/SCRAP/DMRC/04
|
Sale of Scrap, i.e., cut pieces of various size Copper conductor
|
03.05.13
|
06.05.13
|
27.05.2013 up to 15.30 hrs.
|
28.05.2013 at 11.30 hrs.
|
80000
|
|
|
IRCON/2034/ROB-BIHAR/TENDER/LC-72(3leg)/2013/15 Date:07/05/2013
|
Construction of Third leg of Road over Bridge including foundation , substructure , superstructure , slip road , Reinforced Earth wall, Retaining wall etc. in lieu of LC- 72 at Km 536 between Gulzarbagh and Patna Saheb Section in Danapur Division of E C Railway , Bihar.
|
07.05.13
|
07.05.13
|
28.05.2013 up to 15.00 hrs.
|
28.05.2013 at 15.30 hrs.
|
1000000
|
|
|
IRCON/2049/ROB-II-BIHAR/TENDER/LC-22/I/2013/16 Date:09-05-2013
|
Construction of Road over Bridge both railway span and adjacent approach span including Reinforced Earth wall/ Retaining wall in lieu of LC- 22/SPL at Km 264/1 at Narakatiaganj yard on Barauni- Gorakhpur Route in Samastipur Division of E C Railway , Bihar.
|
09.05.13
|
09.05.13
|
31.05.2013 up to 15.00 hrs.
|
31.05.2013 at 15.30 hrs.
|
3770000
|
|
|
IRCON/3015/ROB-RAJ/SGNR-/RT2/13/44
|
Construction of four lane Road Over Bridges ROB with approaches as per Specifications and Quality Control Standards etc complete including detailed design and drawings in Lieu of LC 119 at SRI GANGANAGAR in Rajasthan State
|
03.05.13
|
10.05.13
|
31.05.2013 up to 15.00 hrs.
|
31.05.2013 at 15.30 hrs.
|
2005000
|
|
|
IRCON/3015/TN/ROB-RAJ/SGNR-RUB/13/45
|
Design and Construction of Two Lane Rail Under Bridge RUB by Cut and Cover Technique comprising Two Boxes ie One for each lane including its approaches Design Casting and Placing box segments traffic block, Drainage Allied Road works and Junction Development etc complete as per Specifications and Drawings Maintaining all Quality Control Standards complete near LC 119 at SRI GANGANAGAR in Rajasthan State
|
03.05.13
|
10.05.13
|
31.05.2013 up to 15.00 hrs.
|
31.05.2013 at 15.30 hrs.
|
1150000
|
|
|
IRCON/ELECT/1029/RCF-RBL/Ind. Lights/49
|
SUPPLY OF 200W, 230V AC, 50Hz, HIGHBAY INDUCTION LIGHT FITTINGSFOR NEW RAIL COACH FACTORY, RAE BARELI (U.P.)
|
03.04.13
|
04.04.13
|
29.04.2013 up to 15.00 hrs. Changed to 09.05.2013 up to 15.00 hrs. Changed to 20.05.2013 up to 15.00 hrs. Changed to 31.05.2013 up to 15.00 hrs.
|
29.04.2013 at 15.30 hrs. Changed to 09.05.2013 at 15.30 hrs. Changed to 20.05.2013 at 15.30 hrs. Changed to 31.05.2013 at 15.30 hrs.
|
488000.00
|
|
|
IRCON/Fin/Outsourcing/ 2013-14
|
Expression of Interest for Appointment of Chartered Accountants Firms in
Ircon International Limited for the year 2013-14
(Selection of the Firm will be from amongst those who submit EOI)
|
16.05.13
|
16.05.13
|
31.05.2013 up to 15.30 hrs.
|
31.05.2013 at 00.00 hrs.
|
0
|
|
|
IRCON/MECH/1029/RCF.RBL-II/Universal Milling Machine/205 dtd 14.05.13
|
(01 No.) UNIVERSAL MILLING MACHINE for RCF RBL Project.
|
14.05.13
|
14.05.13
|
03.06.2013 up to 11.00 hrs.
|
03.06.2013 at 11.30 hrs.
|
48000
|
|
|
IRCON/MECH/1029/RCF.RBL-II/Stair Case Trolley and Trolley with caster Wheels/100 dtd 14.05.13
|
(20 Nos.) STAIR CASE TROLLEY WITH WHEEL– (1 MT) and (03 Nos.) TROLLEY WITH CASTER WHEELS – (3 MT)for RCF RBL Project.
|
14.05.13
|
14.05.13
|
04.06.2013 up to 11.00 hrs.
|
04.06.2013 at 11.30 hrs.
|
23000
|
|
|
IRCON/MECH/1029/RCF.RBL-II/Lathe Machines/62/RET-II dtd 14.05.13
|
03 Nos. Lathe Machines (i.e 01 no. for Tool Room and 02 nos. for Mill-Wright Shop)for RCF RBL Project.
|
14.05.13
|
14.05.13
|
05.06.2013 up to 11.00 hrs.
|
05.06.2013 at 11.30 hrs.
|
37500
|
|
|
IRCON/MECH/1029/RCF.RBL-II/Heavy Duty Turret Lathe/RET-I/193 dtd 14.05.13
|
02 Nos. Heavy Duty Turret Lathe for RCF RBL Project.
|
14.05.13
|
14.05.13
|
06.06.2013 up to 11.00 hrs.
|
06.06.2013 at 11.30 hrs.
|
270000
|
|
|
IRCON/JK Cell/JAT/14/1014/Q-B/ Housekeeping- SINA ORH/M- 23/
|
Providing housekeeping services for up keeping, watch and ward and maintenance of Officers Rest House at Srinagar on Qazigund-Baramulla New BG Rail Line Project (Package: M-23)
|
16.05.13
|
16.05.13
|
06.06.2013 up to 15.00 hrs.
|
06.06.2013 at 15.30 hrs.
|
76000
|
|
|
IRCON/JK Cell/JAT/14/1014/D-Q/ Barracks–Sumbar yard/OB-10/
|
Construction of 40 Bedded GRP and RPF Barracks and other allied miscellaneous works including compound walls, chain link fencing, etc. in Sumbar Station Yard under Dharam-Qazigund section of USBRL New Rail Link Project ( Jammu and Kashmir) (Package: OB-10)
|
17.05.13
|
17.05.13
|
07.06.2013 up to 15.00 hrs.
|
07.06.2013 at 15.30 hrs.
|
494500
|
|
|
IRCON/CC/TN/JBRLP-2050/13/685 Dt. 20.05.2013.
|
Construction of Civil
work including Embankment,
Blanketing, major and minor
Bridges and other
ancillary works from
International Boundary
(near AKAUNNHA Village)
OSRAHI Section Ch.Km
2+975 to KM 27+775 (near
Kapileshwar Mahuwa
Village) of Nepal side
alignment portion in
connection with Gauge
Conversion and Construction
of New Broad Gauge Railway
Line from JAYNAGAR(INDIA)
To BARDIBAS(NEPAL)
|
20.05.13
|
21.05.13
|
12.06.2013 up to 15.00 hrs.
|
12.06.2013 at 15.30 hrs.
|
3500000.00
|
|
|
IRCON/MECH/1029/RCF.RBL-II/Salt Spray Chamber/171/RET-I dtd 14.05.13
|
(02 nos.) SALT SPRAY CHAMBER for RCF RBL Project.
|
14.05.13
|
14.05.13
|
14.06.2013 up to 11.00 hrs.
|
14.06.2013 up to 11:30 hrs.
|
58000
|
|