A navratna company

 

 

 

 

 

NSE Tracker | BSE Stock Watch

Rail Good Work Portal

Mostbet casino Türkiye'nin en iyisidir, her gün yüzlerce oyuncu tarafından ziyaret edilir - çevrimiçi spor bahisleri, oyun kartları, slotlar ve rulet.
  • Last Modified: Friday 19 April 2024.

Corporate Office

Railway Station,Banihal,J & K

Railways

Highways

Station Building, Malaysia

Building

Bridges/Flyover

Rail-cum- Road Bridge at Patna, Bihar

Signalling and Telecom

Tracking Project, Malaysia

66 KV Yard at Mukundpur, Delhi

Electrical

Mechanical

Modern Coach Factory, Rae Bareli

arrow
arrow

45 yrs of Engineering Excellence

Turnkey Infrastructure Construction Company

Presence in 20+ Countries

C.M.D's Desk


Shri. Brijesh Kumar Gupta
Chairman & Managing Director

(Additional Charge)

News

Ircon in association with Ministry of Parliamentary Affairs organized a Five (5) days' long exhibition on Hon'ble PM's New India- We Resolve to Make (Vision 2022)/ Sankalp Se Siddhi. (View Report)

IRCON has recently signed an MoU with RZD International L.L.C and RDIF Management Company for promoting investment cooperation among the Parties in Railway sector in both Russia and India.

IRCON has signed an MoU with CIDB Holdings Sdn. Bhd. for Railway Infrastructure Projects and Redevelopment of Railway Stations in India and other countries.

IRCON has signed an MoU with CDTIC (Construction and Development of Transportation Infrastructures Company) for developing the Chabahar - Zahedan Railway Project in Iran.

IRCON has completed the work of "Construction of 2nd Bhairab Railway Bridge with Approach Rail Lines (Lot-A)" in Bangladesh.

IRCON has completed the work of "Turrnkey package for dismantling of existing 66/33/11 KV Sub-station and design, engineering, construction, supply, erection testing and commissioning of 2x20 MVA, 66/33 KV Sub-staion including all assoiciated works at Paro" in Bhutan.

IRCON has completed the work of "Contract KT-4 & KT-5R1: Design, Supply, Installation, Testing and Commissioning of Ballastless Track of Standard Gauge in elevated section of Aluva to Petta corridor" for Kochi Metro Rail Limited.

IRCON has been awarded the work of "Six-Laning of Davanagere-Haveri from (Km. 260+000 to Km. 338+923)of NH-48 in the state of Karnataka to be executed on Hybrid Annuity Project on DBOT Annuity Under NHDP Phase-V." - Rs. 10950.00 Million

 

IRCON has been awarded the work of "Design, Drawing and Construction of External Development works & External Services" for NIT Mizoram. - Rs. 3296.70 Million.

IRCON has been awarded the work of "Railway Electrification work for Mathura Kasganj Kalyanpur." - Rs. 3059.00 Million

IRCON has been awarded the work of "Railway Electrification work for Katni Singrauli." - Rs. 2583.30 Million

IRCON has been awarded the work of "Construction of Embankment, Track, All civil works, major and minor bridges (except Rupsha) & culverts and implementation of EMP of Khulna - Mongla Port Rail Line; Package No. WD1" in Bangladesh. - Rs. 9713.00 Million

IRCON has been awarded the work of "Civil and Railway allied works including S&T, Mechanical and new block station & associated works for the proposed 3.0 MTPA integrated Steel Plant at Nagarnar, near Jagadalpur, Chhattisgarh by NMDC; Package No. I, II & IV." - Rs. 4464.00 Million






Our Mission

(i)  To effectively position the Company so as to meet the construction needs of infrastructure development of the changing economic scenario in India and abroad.
(ii) To earn global recognition by providing high quality products and services in time and in conformity with the best engineering practices.

Our Vision

To be recognized nationally and internationally as a construction organization comparable with the best in the field covering the entire spectrum of construction activities and services in the infrastructure sector.

Sh. Hitesh Khanna

Director (Works)

Born on 07.10.1959 he did B.Sc (Civil Engineering) with Honours from Delhi College of Engineering in1981 and is an Indian Railway Services of Engineers (IRSE) officer of 1981 batch. Prior to joining Indian Railways in 1983, he had worked for two years in Engineers India Limited.
In his 32 year long career, he has worked for Indian Railways in various capacities for 20 years. During this period, he underwent training on the subject Maintenance and overhauling of track Machines at TRANSMARK Derby, UK in 1995 and presented several technical papers in seminars. He has been a recipient of General Manager’s award (in April 1997) and K.C. Sood Memorial Medal (in January 1999). Areas of his expertise include track maintenance, renewal and construction including modern track laying technology.
He joined Ircon on deputation in March 2003 as General Manager and was posted as GM/Design till November 2007 in Malaysia where his role was crucial in securing the largest double tracking project in Malaysia worth USD 1 billion. He took absorption in Ircon in February 2007 and was elevated as Executive Director/J&K in November 2007. Commissioning of the Rs. 2600 crore project of Qazigund-Baramulla Rail Link in Kashmir Valley was accomplished during his tenure. As ED/Works from 17.05.2010 to 06.03.2011 he was responsible for overseeing Ircon’s double tracking project in Malaysia as well as civil works in the Western and Eastern Region of India including the major Rail cum Road Bridge over River Ganga Road works and ROBs in the State of Bihar.
He assumed office as Director Works on 07.03.2011. Under his guidance Phase-I of SGEDT Project was commissioned in April 2011 and Qazigund-Banihal Section including India’s largest transportation tunnel T-80, has been commissioned in June 2013.

-