A navratna company

 

 

 

 

 

NSE Tracker | BSE Stock Watch

Rail Good Work Portal

Mostbet casino Türkiye'nin en iyisidir, her gün yüzlerce oyuncu tarafından ziyaret edilir - çevrimiçi spor bahisleri, oyun kartları, slotlar ve rulet.
  • Last Modified: Friday 19 April 2024.

Corporate Office

Railway Station,Banihal,J & K

Railways

Highways

Station Building, Malaysia

Building

Bridges/Flyover

Rail-cum- Road Bridge at Patna, Bihar

Signalling and Telecom

Tracking Project, Malaysia

66 KV Yard at Mukundpur, Delhi

Electrical

Mechanical

Modern Coach Factory, Rae Bareli

arrow
arrow

45 yrs of Engineering Excellence

Turnkey Infrastructure Construction Company

Presence in 20+ Countries

C.M.D's Desk


Shri. Brijesh Kumar Gupta
Chairman & Managing Director

(Additional Charge)

News

Ircon in association with Ministry of Parliamentary Affairs organized a Five (5) days' long exhibition on Hon'ble PM's New India- We Resolve to Make (Vision 2022)/ Sankalp Se Siddhi. (View Report)

IRCON has recently signed an MoU with RZD International L.L.C and RDIF Management Company for promoting investment cooperation among the Parties in Railway sector in both Russia and India.

IRCON has signed an MoU with CIDB Holdings Sdn. Bhd. for Railway Infrastructure Projects and Redevelopment of Railway Stations in India and other countries.

IRCON has signed an MoU with CDTIC (Construction and Development of Transportation Infrastructures Company) for developing the Chabahar - Zahedan Railway Project in Iran.

IRCON has completed the work of "Construction of 2nd Bhairab Railway Bridge with Approach Rail Lines (Lot-A)" in Bangladesh.

IRCON has completed the work of "Turrnkey package for dismantling of existing 66/33/11 KV Sub-station and design, engineering, construction, supply, erection testing and commissioning of 2x20 MVA, 66/33 KV Sub-staion including all assoiciated works at Paro" in Bhutan.

IRCON has completed the work of "Contract KT-4 & KT-5R1: Design, Supply, Installation, Testing and Commissioning of Ballastless Track of Standard Gauge in elevated section of Aluva to Petta corridor" for Kochi Metro Rail Limited.

IRCON has been awarded the work of "Six-Laning of Davanagere-Haveri from (Km. 260+000 to Km. 338+923)of NH-48 in the state of Karnataka to be executed on Hybrid Annuity Project on DBOT Annuity Under NHDP Phase-V." - Rs. 10950.00 Million

 

IRCON has been awarded the work of "Design, Drawing and Construction of External Development works & External Services" for NIT Mizoram. - Rs. 3296.70 Million.

IRCON has been awarded the work of "Railway Electrification work for Mathura Kasganj Kalyanpur." - Rs. 3059.00 Million

IRCON has been awarded the work of "Railway Electrification work for Katni Singrauli." - Rs. 2583.30 Million

IRCON has been awarded the work of "Construction of Embankment, Track, All civil works, major and minor bridges (except Rupsha) & culverts and implementation of EMP of Khulna - Mongla Port Rail Line; Package No. WD1" in Bangladesh. - Rs. 9713.00 Million

IRCON has been awarded the work of "Civil and Railway allied works including S&T, Mechanical and new block station & associated works for the proposed 3.0 MTPA integrated Steel Plant at Nagarnar, near Jagadalpur, Chhattisgarh by NMDC; Package No. I, II & IV." - Rs. 4464.00 Million






Our Mission

(i)  To effectively position the Company so as to meet the construction needs of infrastructure development of the changing economic scenario in India and abroad.
(ii) To earn global recognition by providing high quality products and services in time and in conformity with the best engineering practices.

Our Vision

To be recognized nationally and internationally as a construction organization comparable with the best in the field covering the entire spectrum of construction activities and services in the infrastructure sector.

Sh.Deepak Sabhlok

Director(Projects)

Mr. Deepak Sabhlok is an Officer of 1982 Batch of Indian Railway Service of Engineers. He is Graduate in Civil Engineering from National Institute of Technology (NIT), Bhopal (Gold Medalist). He has held various responsible positions in many capacities on Northern Railway, North Central Railway, North Western Railway and South Eastern Railway. In his career, spanning over 29 years, he worked on important projects including prestigious Rail Coach Factory, Kapurthala during its construction phase, Chief Engineer Track Machines on South Eastern Railway.
He was incharge of maintenance of civil engineering assets and coordination of various divisional activities of Allahabad Division of NC Railway for over 5 years. He has published technical papers on Bridge Rehabilitation Technique. He has worked on deputation with IRCON for over 5 years as GM/Business Development and GM/Works.
After taking over as Director (Projects) w.e.f. 16.04.2010, he has been responsible for planning, designing, construction and commissioning of Railways, Highways and Electrical Projects. Some of the important projects presently under execution are USBRL Project, Oued-Sly and Yellel Track doubling Project- Algeria (93 Km), Signaling and Electrical Project in South Africa, Coal connectivity projects in the State of Chattisgarh and Orissa, Rae-Bareili Modern Coach Factory, ROBs in Rajasthan, Sivok Rangpo New Railway Line Project, 2 Railway connectivity projects in Nepal i.e. Jogbani-Biratnagar New B.G. Rail Line Project, Jayanagar-Bijalpura-Bardibas New Rail Line Project. He is also part time Chairman of SPVs i.e. ISTPL, IPBTL & ISGTL.

-