Nit No. Tender Category Opening Date of Tender Submission Date of Tender
     
Nit No.Name of Work
(Click to view/download tenders)
Notification DateDownload DateSubmission DateOpening DateEMD(Rs.)Corrigendum(if any)
IRCON/1020/NHAI/UP-05/NIT/221. Disposal of 40 mm size crushed aggregates and Boulder from Pirona Camp at Km. 175+000 and 40 mm aggregates from Badagaon camp at 203+600 UP-05 Road Project

30.05.13 31.05.13 21.06.2013 up to 15.00 hrs. 21.06.2013 at 15.30 hrs. 0
IRCON/1020/NHAI/UP-05/NIT/222 Dismantling and or removal of temporary structures at badagaon orai and reclamation of the area of badagaon camp and office by excavating unsuitable soil and filling suitable soil for cultivation purpose

30.05.13 31.05.13 21.06.2013 up to 15.00 hrs. 21.06.2013 at 15.30 hrs. 20000
IRCON/1020/NHAI/UP-05/NIT/223 Dismantling and or removal of temporary structures at Badagaon Orai and reclamation of the area of Badagaon work shop and plant area by excavating unsuitable soil and filling suitable soil for cultivation purpose.

30.05.13 31.05.13 21.06.2013 up to 15.00 hrs. 21.06.2013 at 15.30 hrs. 20000
IRCON/1020/NHAI/UP-05/NIT/224 Reclamation of the Area at Pirona camp by filling suitable soil for cultivation purpose

30.05.13 31.05.13 21.06.2013 up to 15.00 hrs. 21.06.2013 at 15.30 hrs. 40000
IRCON/1020/NHAI/UP-05/NIT/225 Disposal of Laboratory equipment survey instruments and Hydraulic jacks from IRCON Laboratory/Store situated at Badagaon camp at Km. 203+600 UP-05 Road

30.05.13 31.05.13 21.06.2013 up to 15.00 hrs. 21.06.2013 at 15.30 hrs. 0
IRCON/CC/TN/GBSS-Patna/13/686 Dated 03.06.2013 Assembly, erection / launching of (7x123m)span from pier No.-19 to pier No.-26 and (1x64m)span between pier No.-37 to abutment A2, triangulated steel girders for new rail-cum-road bridge across river Ganga at Patna from Pahlejaghat Island End (North Island End) including transportation of fabricated components of (7x123m) span from fabrication workshop at Pahlejaghat end and (1x64m) span from fabrication workshop at Dighaghat End of river Ganga to launching site including casting of bed bloc

03.06.13 03.06.13 24.06.2013 up to 15.00 hrs. 24.06.2013 at 15.30 hrs. 2865000
IRCON/ELECT/5020/DMRC.CE-6 LOT-1/66kV SF-6 CB/24 Date: 04.06.2013 Tender for Supply of 66kV, 2000A SF-6 Gas filled Circuit Breakers for Contract CE-6 LOT-1 for Delhi MRTS Project Phase-III.

04.06.13 04.06.13 25.06.2013 up to 15.00 hrs. 25.06.2013 at 15.30 hrs. 225000
IRCON/3014/RRVUNL.RS/Tender/SS/02/1054 Design, Supply, Installation, Testing, Commissioning and Handing over of 2 x 750 KVA 11/ 0.433 KV Sub Station for KaTPP Railway Siding Jhalawar

04.06.13 06.06.13 25.06.2013 up to 15.00 hrs. 25.06.2013 at 15.30 hrs. 254000
IRCON/JK Cell/JAT/14/1014/D-Q/Access Road-T-50(P2)/M-9R/ 255/ Construction of access road to Tunnel T-50 P2 and Strengthening and widening of access road approaching to Kundan nalla Adit including construction of substructure of Bailey bridge at Mohumangit river in connection with Construction of Dharam-Qazigund Section of JandK Rail Link Project (Package M-9R)

11.06.13 12.06.13 25.06.2013 up to 15.00 hrs. 25.06.2013 at 15.30 hrs. 683500
IRCON/CC/TN/JBRLP-2050/13/688 Dt. 04.06.2013 Construction of Civil work including Embankment, Blanketing, Bridges and other ancillary works in Nepal from KM 27+775 near Kapileshwar Mahuwa Village to KM 52+336 Sitapur Bangha (Bijalpura yard) in connection with Gauge Conversion and Construction of New Broad Gauge Railway Line from JAYNAGAR (INDIA) to BARDIBAS (NEPAL)

04.06.13 05.06.13 27.06.2013 up to 15.00 hrs. 27.06.2013 at 15.30 hrs. 3193000
IRCON/ELECT/5020/DMRC.CE-6 LOT-1/66kV CVT/28 Date: 06.06.2013 Supply of 66kV Capacitive Voltage Transformers (CVT) for Contract CE-6 LOT-1 for Delhi MRTS Project Phase-III

06.06.13 06.06.13 27.06.2013 up to 15.00 hrs. 27.06.2013 at 15.30 hrs. 165000
IRCON/CC/TN/SR-2046/689 Dt. 07.06.2013 Consultancy works for development of alternative alignment on east side of Teesta river between Km 0.00 at Sivok yard to Km 11.00 (approx. chainage as part of already proposed alignment G) for Broad Gauge Rail Link between Sivok in West Bengal and Rangpo in the state of Sikkim.

07.06.13 10.06.13 02.07.2013 up to 15.00 hrs. 02.07.2013 at 15.30 hrs. 135000
IRCON/JK Cell/JAT/14/1014/D-Q/ Survey team–D-Q Section/S-1/ Hiring of services of survey teams for survey works of D-Q Section in connection with Construction of Dharam-Qazigund Section of J and K Rail Link Project (Package S-1)

17.06.13 18.06.13 02.07.2013 up to 15.00 hrs. 02.07.2013 at 15.30 hrs. 120500
IRCON/MECH/1029/RCF.RBL-II/Heavy Duty Sewing Machine and Lab Equipments/145 dtd 07.06.13 Heavy Duty Sewing Machine, Electric Water Bath Equipment, Low and High Impedance Analyser, Chemical Balance and DFT Meter (01 no. Each)

07.06.13 07.06.13 03.07.2013 up to 15.00 hrs. 03.07.2013 at 15.30 hrs. 9880
IRCON/MECH/1029/RCF.RBL-II/Lab Equipments/162 dtd 07.06.13 Physical Analytical Balance, Low Load Portable Hardness Tester, Digital Hot Plate and Punching Machine (01 no. Each)

07.06.13 07.06.13 04.07.2013 up to 15.00 hrs. 04.07.2013 at 15.30 hrs. 8320
IRCON/MECH/1029/RCF.RBL-II/Pillar Drill and Gang Drill Machine/97 dtd 07.06.13 Pillar Drilling Machine and Gang Drilling Machine (01 no. Each)

07.06.13 07.06.13 05.07.2013 up to 15.00 hrs. 05.07.2013 at 15.30 hrs. 8600
IRCON/JK Cell/JAT/14/1014/D-Q/Hiring Veh-Jammu/VH-07/ 264/ Hiring of vehicles for IRCON Officers and Staff for J and K Cell, Jammu in connection with USBRL Project Work (J and K) (Package VH-07)

17.06.13 18.06.13 05.07.2013 up to 15.00 hrs. 05.07.2013 at 15.30 hrs. 40500
IRCON/CC/TN/CGRLP/JVCs office/13/687 Dt. 03.06.2013 Internal finishing work, partitions, false ceiling, modification of toilets, plumbing, electrical and sanitary works etc. in connection with Setting up new office for JVCs at Raipur (Chhattisgarh)

03.06.13 04.06.13 05.07.2013 up to 15.00 hrs. 05.07.2013 at 15.30 hrs. 71700
IRCON/MECH/1029/RCF.RBL-II/Lab Equipments/102 dtd 07.06.13 Portable Thickness Meter, Drop Weight Impact Tester, Digital Oscillator and Electronic Analytical Balance (01 no. Each)

07.06.13 07.06.13 09.07.2013 up to 15.00 hrs. 09.07.2013 at 15.30 hrs. 10300
IRCON/MECH/1029/RCF.RBL-II/Laser Cutting Machine Simulator/158 dtd 07.06.13 (01 No.) LASER CUTTING MACHINE SIMULATOR

07.06.13 07.06.13 11.07.2013 up to 15.00 hrs. 11.07.2013 at 15.30 hrs. 20000
IRCON/MECH/1029/RCF.RBL-II/Transport Shop/113 dtd 07.06.13 FIP Test Bench, Nozzle Tester, Nozzle Lapping Machine and Valve Lapping Machine (01 no. Each)

07.06.13 07.06.13 12.07.2013 up to 15.00 hrs. 12.07.2013 at 15.30 hrs. 25120
IRCON/MECH/1029/RCF.RBL-II/CNC TRAINER LATHE/169 dtd 07.06.13 (02 Nos.) Center Lathe Machine and (01 no.) CNC Training Lathe Machine

07.06.13 07.06.13 16.07.2013 up to 15.00 hrs. 16.07.2013 at 15.30 hrs. 165000
IRCON/MECH/1029/RCF.RBL-II/Surface Grinding/89/RET-II dtd 07.06.13 (01 No.) CNC SURFACE GRINDING MACHINE

07.06.13 07.06.13 17.07.2013 up to 15.00 hrs. 17.07.2013 at 15.30 hrs. 262000
   
 Corporate Office           Disclosure Under Listing Agreement